Welcome to the Official page of the Presidency of the Portuguese Republic

Note on navigating with support technologies

On this page you will find two navigation aids: a search engine (shortcut key 1) | Skip to content (shortcut key 2)
Assembleia Geral das Nações Unidas
Assembleia Geral das Nações Unidas
Nova Iorque, EUA, 28 de setembro de 2015 see more: Assembleia Geral das Nações Unidas

DIRECT PRESIDENCY

See the Pictures | HIGHLIGHT

Palácio de Belém já tem instalados 126 painéis fotovoltaicos que reduzem factura energética e emissões de CO2 (1)
Palácio de Belém já tem instalados 126 painéis fotovoltaicos que reduzem factura energética e emissões de CO2 (2)
Palácio de Belém já tem instalados 126 painéis fotovoltaicos que reduzem factura energética e emissões de CO2 (3)

Click to enlarge.

HIGHLIGHT

Click here to reduce font size| Click here to increase font size
Panels installed on the roof of the Palace

Panels installed on the roof of the Palace

Palace of Belém completes installation of 126 photovoltaic panels to reduce energy bill and CO2 emissions

The Presidency of the Republic has completed the installation of 126 photovoltaic panels with the objective to reduce the energy bill and CO2 emissions in the Palace of Belém, a system which already allows the coverage of 15% of the Presidency’s electric power usage.

Following the Energy Audit Report on the Palace of Belém, requested by the President of the Republic, and the Measures of Energy Efficiency announced in January 2008, with the objective to reduce the energy bill by 40% and CO2 emissions by 30% in the Palace of Belém, the installation of 126 photovoltaic panels has been completed, and will supply approximately 20 kW of solar photovoltaic power.

With an estimated annual production capacity of 30,152 KWp, the photovoltaic system installed will cover approximately 15% of electric power consumed by the Presidency of the Republic.

This installation is added to other measures already developed amongst those foreseen for the purpose of obtaining energy efficiency and environmental protection, of which the main are:
 

           • Thermal insulation of the roofs of the buildings and of the heating and air conditioning pipes; 
           • Replacement of the internal and external lighting equipment by more efficient systems; 
           • Replacement and alteration of the operation of the heating, ventilating and air conditioning systems;
           • Conversion of diesel consumption to natural gas; 
           • Repair of the existing natural gas boilers


The new equipment and the already completed alterations fulfil the plan of energy optimization carried out in 2008, reducing CO2 emissions by approximately 200 tonnes and contributing significantly towards the reduction of the energy bill.

View here the Energy Audit Report on the Palace of Belém
 

07.10.2008

© 2006-2016 Presidency of the Portuguese Republic

You have gained access to the records of the Official Site of the Presidency of the Republic from 9 March 2006 to 9 March 2016.

The contents available here were entered in the site during the 10 year period covering the two mandates of President of the Republic Aníbal Cavaco Silva.